Old oil tank detection in Châteauguay
An old buried oil tank can lie under the lawn of a Châteauguay house, under a driveway or near an outbuilding on a rural property. We search for it with ground-penetrating radar, confirm the oil line by radio detection and give you a PDF report within 24 hours showing its position and the depth to its top.
- PDF report within 24 hours
- Submit your Info-Excavation request for public utilities, and entrust us with the private utilities on your property.
Project typeOld heating oil tank
Town and country, two types of search
In residential areas, the tank is generally near the foundation, on the side where it was filled. The search focuses on visible clues and a strip along the house.
On a farm property, the situation is different. A tank may have supplied a secondary building or equipment, and may lie farther from the house. The search area is larger and relies more on the property's history.
The regulatory context
Since December 31, 2023, it has been prohibited in Quebec to install an oil-fired heating appliance in an existing building or to replace an oil appliance with a fossil fuel appliance (1). When the regulation was adopted, the government pointed out that heating oil is also a source of soil contamination when leaks occur (2). This risk is often what prompts the search before a sale or work.
What the report contains
- The plan of the scanned area and the position of targets
- The estimated depth to the top and approximate dimensions
- Other structures detected, such as a pit or a sump
- A clear statement if nothing was detected in the area covered
Frequently asked questions
How much area needs to be covered on a rural property? It depends on the clues and the history. Describe the buildings and the former heating method; we will propose a suitable search area.
Can you remove the tank? No. We locate it and document its position for the contractor in charge of the removal and, if needed, the soil characterization.
Plan your survey
Send us the address and the type of work. Reply within 24 to 48 business hours.
- PDF report within 24 hours
- Submit your Info-Excavation request for public utilities, and entrust us with the private utilities on your property.